Cogeneration Grubišno Polje

location:
Grubišno Polje
phase:
preliminary, main and detailed design
size:

5 MW

author:
Goran Obranović
chief designer:
Slaven Pavlović
photo:
Robert Leš
year:
2018

Cogeneration plant on the outskirts of Grubišno Polje is a part of a larger facility that also includes a timber drying plant. The focus of the facility is placed on a large building that houses the boiler and the generator. The building is surrounded by various structures that are included in electrical and thermal power production processes. The coldness of concrete and steel is softened by the use of bright primary colors for the details and the use of warm brown hues, the color of primary raw materials – wood chips, on the finish materials.

Goran Obranović

similar projects

Ciglena geothermal power plant

, 2018

Cogeneration Babina Greda

, 2015

Cogeneration Spin Valis

, 2014